Intel Arrow Lake Refresh and Nova Lake, the leaks already look to 2026


There are still two months left until the launch of Intel Meteor Lakebut the rumors already speak of future generations of processors. In the last few hours, Moore Law Is Dead has shared the first details regarding Arrow Lake Refresh and Nova Lake, which will debut between 2025 and 2026.

Arrow Lake Refresh would be scheduled for now second half of 2025 and, as the name suggests, it won’t be too different from the previous Arrow Lake range, although there will be no shortage of new features. According to the information in possession of Moore Law Is Dead these processors will have the double the E-Core, reaching up to 32, and will use the LGA1851 socket. The architectures they would remain Lion Cove for P-Core and Skymont for E-Core and LPE-Core, while the chip would be produced with i Intel 20A and TSMC N3B nodes.

Arrow Lake Refresh should clash with AMD Ryzen 8000 or 9000 chips, based on Zen6 architecture. Virtually nothing is known yet about the design of the Ryzen processors, however according to rumors they will adopt a hybrid architecture and will have more than 24 cores.

Nova Lake will instead arrive in the second half of 2026, after Panther Lake, and the count of P-Core and LPE-Core will increase, this time leaving the E-Core count intact; this will lead to having configurations up to 16 P-Core, 32 E-Core and 4 LPE-Core. According to the leaker, the chips will be produced with the TSMC N2B and Intel 18A, or Intel 14A processes (it is not yet clear what the company will call the node following 18A), while it is not yet clear which architectures will be used: E-Core and LPE-Core should be based on Arctic Wolf, while P-Core would rely on Rentable Unit, but Moore Law Is Dead has several doubts on this matter and suggests not to take this information as definitive.


Cover image: alexgrec


Related News

Marvel’s Avengers will lose support on September 30. Square Enix moves away from the high-profile comic production

It's been more or less 2.5 years since the debut of Marvel's Avengers and what is actually the easiest thing to identify with production is hope. Before the

“BCLK” overclocking is completely locked out in Intel 13th Gen Non-K CPUs

It looks like Intel has completely disabled overclocking on non-K 13th Gen CPUs which is bad news for motherboards that support BCLK overclocking.

Intel Unison, the new tool so you can control your mobile from your PC

With the arrival of Windows 11, Microsoft has decided to integrate a little more with Android and in this case it has done so by improving its software that

The first ARM Chromebook with the new Android 11 ARCVM container is finally on the way

To say that the transition to the new Android container on Chromebooks (ARCVM) has been a long, painful journey would be a huge understatement. Started well

Samsung Galaxy A53 vs Xiaomi Redmi Note 11 Pro Plus, differences, comparison and which is better

Two of the most attractive mid-range models of the moment are the Samsung Galaxy A53 and Xiaomi Redmi Note 11 Pro Plus. Both are also one of the most advanced